Skip to content

Case Study

Dual String DIAL System Successfully Installed for Offshore South East Asia Operator

A pilot DIAL installation campaign was initiated between Silverwell and an offshore operator in South East Asia. The five well program consists of three single string and two dual string wells across multiple fields.

The purpose of the program is to test the DIAL system in a multitude of operating conditions, including high deviation deployment, proving DIAL’s digital production optimization and interventionless capabilities ahead of a wider adoption strategy. A dual completion well was installed in November 2020.