Skip to content

Case Study

DIAL System Installed in High Deviation Offshore Well

A five well pilot program was initiated with an offshore operator in South East Asia. This consisted of three single string and two dual string wells across multiple operating assets.

The purpose was to test the DIAL system in multiple operating conditions, including high deviation deployment. This would prove DIAL’s interventionless production optimization capabilities ahead of a wider adoption strategy.