An IOC operating in the Permian Basin initiated a pilot program of Silverwell's DIAL gas lift production optimization system.
The purpose was to assess Silverwell’s delivery and installation, DIAL technology reliability, and to evaluate lift performance improvement compared to a conventional Injection Pressure Operated (IPO) gas lift system.