Skip to content

Case Study

DIAL Gas Lift Enables Production Optimization and Reduces Well Intervention in Southeast Asia Onshore Field

A two well pilot of the DIAL System was implemented with an onshore operator in Southeast Asia.

An in-well DIAL unit enabled continuous production optimization through monitoring key production parameters and using the information to control gas injection rate without well intervention.